Government of Nepal   बुढीगंगा जलविद्युत आयोजना  
 
 
 

श्री श्याम किशोर यादव

आयोजना प्रमुख

 

Budiganga Hydropower Project

 

Budhiganga Hydropower Project aims at contributing to the social and economic development of Nepal through increasing electricity generation capacity of the country which will help to meet the load demand and reduce the load shedding by developing the Budhi Ganga Hydroelectric Power Project. The Project is a peaking run-of-river type that lies within the Achham and Bajura districts on the Budhi Ganga River, a major tributary to the Seti River and is located in the Far Western Development Region approximately 890 km west of the capital Kathmandu.

 

read more

 

 

Salient Features

 

Name of Project

Budhi Ganga Hydropower Project  

District

Achham

Power House Site

Thapagaon Village (Hatikot VDC Ward No 4) (on Left Bank of River)

Dam Site

Budha Bagar (In between Babla VDC Ward No 3 and Kuskot VDC Ward No 5)

Name of the River

Budhi Ganga River

Type of Scheme

Run-of the River with Daily Pondage (6 hrs Peaking)

Installed Capacity

20 MW

 

read more

 

 

सूचना अधिकारी

इ. पुनम पाण्डे

इन्जिनियर
फोन: +९७७-१-४४२३२०६
इमेल: poonampandey@bhp.gov.np

 

 

Latest Updates

 

 

 

 

 

 
 
   
 
© Budhi Ganga Hydropower Project. All rights reserved.   |   Powered by : Weboo Art