Government of Nepal   Budhi Ganga Hydropower Project  
 
 

 

Vision, Mission

Vision
"Brighter and prosperous Nepal through the sustainable hydropower generation harnessing the country's available water resources with the competent public sector"

Mission

  • Capacity building of Public sector in hydropower development for sustainable economic growth of the country;
  • Completion of the hydropower projects of desired quality within the stipulated time by the estimated cost;
  • Supply of reliable energy in Integrated National Power System (INPS) by the early completion of the project;

Objectives

  • Complete the 20MW capacity Budhiganga hydropower project, located in Achham district of specified standards within 2020 by the estimated cost.
  • Develop 132KV transmission line from Budhiganga to Lamki (88km) to evacuate the power developed; this line may also used to evacuate the power developed by the private sector in this region.
  • Capacity building of the public sector in hydropower generation as well as in regulation and monitoring activities learning from this project and implement larger projects successively.
  • To open up the economic activities and other development program in integrated manner with this project, achieving the regional balance in development of far western region.

Targets

  • Completion of the preconstruction activities including detailed design and environmental study by 2017
  • Completion of the main construction activities (Civil, electromechanical and hydromechanical works)  of the project by 2020.
  • Completion of the 88km long 132kV transmission line from Budhiganga to Lamki by 2020.
 

 

 